Finish Stage
As of this date 4/25/2007 we are in the finishing stages of the house construction. The house is set to be finished by May 30, 2007. The exterior tapered columns have been set in both the front and rear porches. The front deck has a slate tile finish where as the rear elevated deck has a composite deck instead of chemical pressure treated wood. Exterior will be mostly maintenance free except for the rail and columns which won't need a lot of upkeep. The dormers are stained cedar siding.
As for the electrical, all the air tight recess cans will be using compact florescent bulbs. All the interior light fixtures and ceiling fans are Energy Star rated and will use up to 70% less energy than regular incandescent lights. All the bathrooms are equipped with special timer switches which will shut off automatically after a predetermined time frame. This is to encourage the use of bathroom fans after showering so as to exhaust the humid air to the outside. According to the RimRate program software, this house will use an average of $155.00 per month for all the energy needs for this 3,650 sq. ft. house!